Serving Greater Somerville

Hardwood Floor Installation

Solid and engineered hardwood installed over a checked subfloor, acclimated to the house and matched to the old floors in the rooms next door.

Somerville Wood Flooring handles hardwood floor installation in Somerville, MA, serving surrounding cities including Cambridge, Charlestown, Medford, Everett, Back Bay. With 20+ years spent working on the area’s older houses and condos, we install new solid and engineered wood floors that sit comfortably next to century-old red oak and pine, and that hold up through a Massachusetts heating season.

Most installation problems start below the new floor. An uneven subfloor shows as gaps and bounce, a damp one shows as cupping, and wood laid before it has acclimated moves for months afterward. We check and prepare what is underneath first, and only then choose the flooring and the way it is fastened.

Choosing the Right Hardwood

Worker nailing new red oak strip flooring with a manual flooring nailer in the parlor of a mansard-roofed Somerville house.

Solid Hardwood

Solid hardwood is one piece of wood from top to bottom, tongue and groove on the edges, nailed to a wood subfloor over the joists. It suits most rooms above grade in a wood-framed house and can be sanded and refinished many times. Red oak, white oak and maple are the common choices, with narrow strip boards matching the original floors in many older houses here.

Engineered Hardwood

Engineered hardwood has a real wood wear layer bonded over a stable core. It moves less than solid wood, so it is the better choice over concrete, in basements, and in condos where the association requires sound-reducing underlayment. The thickness of the engineered wear layer tells you whether the floor can be sanded later.

Prefinished or Site-Finished

Prefinished boards arrive with the factory finish already on, so the floor can be used as soon as it is down and there are no sanding or finish fumes. Site-finished boards are sanded flat after installation and finished in place, which gives a smoother surface, full stain choice and a seamless match to an older floor nearby.

Prefinished floors suit a household that cannot leave the house for finish days, or a unit that has to be back in use quickly. Site-finished floors suit rooms that open onto existing oak, where a factory color would never quite meet the old floor at the doorway.

Preparing the Subfloor

Flatness, Squeaks and Joists

We check the subfloor for dips, humps and loose sections, screw down anything that moves, and shim or plane problem areas. Old joists sometimes sag in the middle of a room; we tell you when that needs a carpenter’s attention before a new floor goes over it.

Removing Old Flooring

Carpet, pad, tack strip and staples come out first. Underneath we may find old oak worth refinishing instead, a layer of vinyl or linoleum, or old resilient floor tile. Old tile and black mastic are identified before any work near them and left to the right trade under 310 CMR 7.15, so nobody sands or scrapes something that should not be disturbed.

In older houses, the build year and any painted trim or thresholds are checked before demolition as well, because Massachusetts runs its own lead-safe renovation rules for homes built before 1978. Removal is done with doors and returns sealed so dust stays in the rooms being worked on.

Moisture and Acclimation

We take moisture meter readings on the subfloor and on the new wood and install only when they are within range of each other, following the NWFA Installation Guidelines and the manufacturer’s requirements. Skipping acclimation is the most common reason new floors gap in winter or cup in summer.

Installation in Older Houses and Condos

Matching an Existing Floor

After a kitchen remodel, an addition or a wall removal, the new floor has to meet the old one. We match species, width and cut, weave new boards into the existing floor at the joint, and site-finish the area so stain and sheen carry across the room.

Condos and Stacked Units

In a condo or a stacked two-family, footsteps on a new hard floor carry to the unit below. We install over a sound-reducing underlayment that meets the association’s rules, which we read from its documents rather than assuming, and schedule work around its notice and work-hour requirements.

In a two-family or three-family house, we install one unit or one floor at a time so the other households keep living there, and plan the noisiest cutting for the hours that disturb them least.

Finishing, Trim and Transitions

New floors are often a different height from the old, so we plan reducers and flush transitions at doorways before ordering. Base and shoe molding cover the expansion gap at the walls. Site-finished floors are sanded and finished with a waterborne polyurethane that fits the Massachusetts VOC limits for wood coatings.

Fastening Methods and Layout

Nail-Down With Flooring Cleats

Solid hardwood over a wood subfloor is blind-nailed through the tongue with flooring cleats, spaced to the manufacturer’s schedule and the NWFA Installation Guidelines. Boards run perpendicular to the joists wherever the room allows, which keeps the floor stiff and reduces squeaks over time.

Glue-Down and Floating Floors

Engineered floors over concrete are usually glued to the slab over a moisture barrier, or floated on an underlayment. Floating suits condos with sound rules and floors over a fragile ceiling, because nothing is nailed into the structure below.

Layout, Board Direction and Racking

We lay out the floor from the longest straight wall or the center of the room, decide board direction with the doorways and adjoining floors in mind, and rack the boards so end joints are well staggered. A careful layout is what makes a new floor look like it was always there.

  • 20+ Years With Wood Floors
  • Written Itemized Estimates
  • Free Estimates

Good to know

Frequently Asked Questions

Solid or engineered: which should we install?

Solid hardwood suits a dry, wood-framed floor above grade and can be sanded many times over its life. Engineered hardwood is more stable over concrete, in basements, and in condos that require sound underlayment. We recommend by room, and many houses end up with both.

How long does a hardwood installation take?

A typical room or two of prefinished flooring goes in over a few days once the material has acclimated and the subfloor is ready. Site-finished floors add sanding and finish days on top. Subfloor repairs, old flooring removal and stairs all extend the schedule, and the estimate spells out each.

Do you install over the existing floor?

Sometimes. A flat, sound layer of old strip oak or plywood can stay as a base, which saves removal and keeps door heights manageable. Carpet, pad, cushioned vinyl and anything loose has to come out. Old resilient tile and black mastic are identified first and left to the right trade before anything else is done.

Why does the wood need to sit in the house before installation?

Wood takes on or loses moisture until it matches its surroundings. Installing boards that are still adjusting is how a new floor gaps in its first winter or cups in its first summer. We read the wood and subfloor with a moisture meter and install when they are within range of each other.

Can new hardwood match the old floor in the next room?

Usually closely. We match species, width and cut, and site-finishing the new floor lets us sand and stain it alongside the old so the colors meet at the doorway. Where a perfect match is not possible, we plan a deliberate transition instead.

What does the price of installation include?

Our written estimate itemizes removal of the old covering, subfloor repairs, underlayment, the flooring itself, installation, trim, transitions and any sanding and finishing. Nothing is folded into a single lump sum, so you can see where the money goes.

Ready to Get Started?

Request a free quote today and we'll get back to you fast.