Winchester, MA

Serving Winchester

Floors for a Winchester accessory apartment, built to take daily wear and to meet the main house's old oak without a visible seam.

Somerville Wood Flooring has spent more than 20 years on wood flooring in Winchester and the rest of the area, and a growing share of the calls we get now start with a household deciding to make room for a second one. That might be a parent moving closer, a grown child coming home, or an owner who wants a smaller space on the same lot.

When a house takes on a second household, its floors take on a second job. The rooms that become an accessory apartment need floors that stand up to a separate kitchen, a separate entry and a separate daily routine. Where those rooms meet the rest of the house, the new boards and the old ones have to read as one floor.

This page covers what we see on those projects: the rules that shaped accessory apartments in this town, the floor decisions that come with carving a unit out of existing rooms, and how we plan the work so the main household keeps living there while it happens.

Floors for an Accessory Apartment Under Winchester’s 2022 Bylaw

Worker unrolling underlayment for a new floor in rooms being turned into an accessory apartment inside a Winchester Colonial Revival house.

Winchester Town Meeting adopted an accessory dwelling unit bylaw in November 2022. It allowed interior, attached and detached ADUs on single-family and two-family lots. It also came with conditions that shaped who could use one, and those conditions explain a lot about how few projects followed.

Who the 2022 bylaw was written for

The bylaw required the property to be the primary residence of the owner, or of the beneficiary of the trust that owns it. It also required at least one person aged 62 or older, or a person with a disability, to live in either the ADU or the main dwelling. The town described the purpose as housing for older residents and for people with disabilities, not general rental stock.

Each ADU had to be a separate dwelling, with its own exits, its own living space, its own cooking facilities and a full bathroom. For floors, that list matters. A kitchen and a bathroom inside what used to be a bedroom wing bring water, appliances and heavier traffic to boards that were laid for quiet use.

How few were permitted

By October 2023 the Building Department had received three ADU applications and approved two building permits. Reporting in August 2024 said only two ADUs had been permitted for construction under the 2022 bylaw, and neither had actually been built. The occupancy rule and the owner-residence rule narrowed the field to a small number of households.

That history is part of why we expect more interest now. The households who looked at an ADU in 2023 and could not qualify are, in many cases, still in the same houses, with the same spare rooms over the garage or at the back of the first floor.

Why interior ADUs are mostly floor work

An interior ADU is built from rooms the house already has. There is no new foundation and often no new framing beyond a wall or two, so the visible change lands on the surfaces: kitchen cabinets, a bathroom, and the floor that ties the new unit together. In a lot of these projects, the floor is the single biggest finish decision the owner makes.

Looking for wood-flooring closer to Brookline? See Wood-Flooring in Brookline.

How the 2025 State Law Changed Winchester ADUs

A state law in effect from February 2025 allows ADUs under 900 square feet by right on single-family lots. The same law does not allow the age restriction, so the 62-plus or disability rule that defined Winchester’s 2022 bylaw no longer governs who can live in one. The town has said plainly that an ADU cannot be used as a short-term rental.

What reporting says about the conformed bylaw

Reporting from November 2024 on the town’s conformed bylaw says it no longer requires owner occupancy and bars rentals shorter than 31 days. The same reporting says it caps ADUs at 900 square feet and requires one off-street parking space, except within a half mile of a commuter rail or bus station. We treat those details as reported, and we point owners to the Town of Winchester Building Department for the current rules on their own lot.

We do not give permit answers for floor work. Permit questions about a particular project belong with the Building Department, and we would rather an owner hear the answer from them than from us.

What 900 square feet means on the floor

A unit under 900 square feet is a compact apartment, and in a compact apartment every room is a traffic room. The path from the entry to the kitchen to the bathroom carries most of the wear, and traffic lanes show up in a few years rather than a decade. We plan the finish and the sheen level around that path, not around the quietest corner of the old bedroom.

Small units also make transitions more visible. With a kitchen, a living area and a bedroom all within a few steps, a threshold that changes height or color by a fraction reads as a mistake. We try to keep the floor continuous across the unit wherever the rooms allow it.

Short stays are off the table, long wear is not

Because an ADU here cannot be a short-term rental, the people living in one are there for the long run. That shifts the floor choice toward durability and easy upkeep. A finish that can take a screen and recoat in a few years, without sanding back to bare wood, is often worth more to an ADU owner than the lowest price on day one.

Matching New Floors to Old in a Winchester Interior ADU

Of Winchester’s 8,521 housing units, 5,875 are one-unit detached houses, and 39.4 percent of the stock was built in 1939 or earlier. In practice, many interior ADUs here will be carved from older houses whose floors were laid long before anyone planned a second kitchen in them. Meeting those floors well is most of the craft.

Reading the existing floor first

Before we quote, we identify the existing species and how it was laid: red oak strip flooring, white oak, maple, or an older softwood such as eastern white pine. We check how much wood remains above the tongue and groove, because a floor that has already been sanded several times may not have another full sanding left. Face nails and cut nails tell us about the floor’s age and how it was fastened.

We also check the build year and any painted surfaces before sanding. Massachusetts runs its own lead-safe renovation rules for homes built before 1978, and many Winchester houses fall well inside that window.

Where the new unit meets the main house

The hardest line in an interior ADU is the doorway between the two households. On one side, an old floor with decades of rug shadow and an amber tone; on the other, new boards or patched areas where a wall moved. We weave new boards into the existing floor so the joint does not run straight across a doorway.

Where a wall comes out to open a kitchen, or where an old radiator, its pipes or a closet are removed, we patch the gap with boards woven into the surrounding floor. A square patch reads as a repair; a woven one reads as the original floor.

Kitchens, bathrooms and the subfloor

A new kitchen brings a sink and a dishwasher into a room that never had water. We check the subfloor and the joists in that area and take moisture meter readings before any wood goes down, and we let new boards go through acclimation in the house. Cupping and crowning near a sink are usually water problems first and floor problems second.

In a bathroom we generally steer owners away from solid hardwood. We would rather finish the wood floor cleanly up to a proper threshold than promise wood will hold up in a room where it often fails.

Sound and finish between the two households

When the ADU sits above part of the main house, footsteps become the first thing either household notices. Where new flooring goes down over an open subfloor, a sound-reducing underlayment is worth discussing, and squeaky floorboards and nail pops are worth fixing before the unit is occupied rather than after.

We lay stain and sheen samples on your own floor so the new unit can match the main house or deliberately set itself apart. Waterborne polyurethane, oil-modified polyurethane and hardwax oil each wear differently, and we choose finishes that fit the Massachusetts VOC limits for wood coatings.

Planning an ADU Floor Project in Winchester

The household already in the house is usually still living there while the ADU takes shape. The floor schedule has to work around them, around the other trades building the kitchen and bathroom, and around the date the second household plans to move in.

Sequencing with the other trades

We prefer to sand and finish after the heavy, dusty work is done and before the final paint touch-ups. Floors finished too early collect scratches from cabinet installers and plumbers; floors finished too late hold up the move-in. We set the floor window with the owner and the general contractor before anything is ordered.

Keeping the main house livable

We seal doors and returns and contain dust to the rooms being worked on, so it does not travel into the part of the house where the family is still cooking and sleeping. Sanding runs with a drum sander and an orbital sander through a grit sequence, with HEPA vacuum cleanup at each stage. We plan fume and drying times around the people in the building, not just the calendar.

If the ADU shares a staircase with the main house, we quote the stairs tread by tread and schedule them so both households have a way up and down. Stair treads, stair risers and stair nosing often need more attention than the floors they connect.

Old surprises under carpet and tile

Rooms converted to an ADU often have carpet pad and tack strip over the original floor, or old resilient tile on top of black mastic. We identify tile and mastic before anything is sanded and leave it for the right trade. Under carpet we sometimes find pet urine stains, water stains or a floor that was never finished in the first place.

When the old floor cannot be saved, we talk through replacement with solid hardwood or an engineered floor, and what the engineered wear layer means for future sanding. Prefinished boards install fast; site-finished boards blend better with an existing floor.

A written estimate before work starts

Every project gets a written, itemized estimate that separates the ADU rooms, the transitions into the main house, and any stairs. Owners planning an accessory apartment are usually juggling several contractors, and a line-by-line floor estimate makes the whole budget easier to read.

If you are turning part of your Winchester house into a home for a second household, we can walk the rooms, read the existing floor and tell you what it will take to make the new unit and the old house look like they belong together.

  • 20+ Years With Wood Floors
  • Written Itemized Estimates
  • Free Estimates

What we do

Services Available in Winchester

Worker walking backwards while spreading a clear finish coat across sanded red oak floors in the front room of a Somerville two-family.

Wood Floor Refinishing

Full sanding and refinishing for old oak and pine floors, with the remaining wood measured first and the work scheduled around the household.

Learn more
Worker drawing the last row of engineered white oak plank tight with a pull bar in a top-floor condominium of a converted Somerville three-decker.

Engineered Hardwood Flooring

Engineered hardwood chosen by wear layer and core, installed over concrete, in condos and over sound underlayment where solid wood would struggle.

Learn more
Worker lacing new oak strips into a Somerville bedroom floor where a removed radiator's pipe holes were, every joint staggered.

Hardwood Floor Repair

Board replacement, radiator hole patches, squeak and nail pop fixes, and insect and pet damage repaired with wood woven into the existing floor.

Learn more
Worker taking a moisture reading on cupped oak boards in the kitchen of a Somerville flat after a leak from the unit above.

Hardwood Floor Water Damage

Water-damaged hardwood traced to the source, dried, measured and documented room by room, then repaired and refinished once the wood is stable.

Learn more
Worker sanding the oak treads of the shared front stair in a Somerville three-decker, the risers left painted.

Hardwood Stair Refinishing

Treads, risers, nosing and railings refinished by hand, painted stairs handled lead-safe, and common hallway stairs scheduled around every unit.

Learn more
Worker nailing new red oak strip flooring with a manual flooring nailer in the parlor of a mansard-roofed Somerville house.

Hardwood Floor Installation

Solid and engineered hardwood installed over a checked subfloor, acclimated to the house and matched to the old floors in the rooms next door.

Learn more
Worker screening a sound oak floor with a floor buffer before a fresh recoat in a Somerville condominium in a converted two-family.

Screen and Recoat Hardwood Floors

A light abrasion and fresh finish coats for floors whose finish is dull and scuffed but still intact, done in a day with almost no dust.

Learn more
Worker rolling up cut carpet to uncover red oak flooring in a bedroom of a Somerville two-family flat.

Replace Carpet With Hardwood

Carpet, pad and tack strip pulled, the oak underneath refinished where it is sound, or new solid or engineered hardwood installed in its place.

Learn more
Worker sanding an old wide pine floor with a square-pad orbital floor sander in the front room of an early Greek Revival house in Somerville.

Pine Floor Refinishing

Old softwood floors sanded with a gentler grit sequence, cut nails set, gaps and splinters dealt with, and finished to suit the wood's warm color.

Learn more
Worker tapping a new white oak herringbone slat into the pattern inside a plain border in the dining room of a Somerville Colonial Revival house.

Herringbone and Wide Plank Floors

Herringbone, chevron and wide plank wood floors laid out from the room's center, fastened over a flat subfloor and sanded and finished in place.

Learn more

Ready to Get Started?

Request a free quote today and we'll get back to you fast.